How to use it
- Pick your pool type, your winters and your cover. The checklist adjusts straight away.
- About a week before you plan to close, test the water and enter the results.
- Balance and shock as the plan says, keep the pump running for the week, then work through the closing-day steps.
Why the chemistry matters more in winter
A closed pool sits for months with no filtering and no fresh chlorine. Whatever state the water is in at closing is what you uncover in spring. Water that goes under the cover clean, balanced and with a little chlorine left usually comes out clear or close to it. Water that goes in with low chlorine and leaves on the floor comes out green.
Cold also changes the balance. The same water that is balanced at 80 °F leans corrosive at 45 °F, because calcium carbonate dissolves more easily in cold water. The plan checks your saturation index at winter temperature; for plaster pools it is better to end the season with pH and calcium toward the top of their ranges than the bottom.
Freezing climates
Ice is what does the expensive damage. Water left in a pipe, pump or heater expands as it freezes and cracks it. That is why closing in a freezing climate means lowering the water below the skimmer and returns, blowing every line clear, plugging it, and draining all the equipment. In-ground skimmers get an ice compensator or skimmer guard; above-ground pools get an air pillow to take the pressure of the ice sheet off the walls.
In mild climates, many owners skip closing altogether and run the pump for a few hours a day all winter, which keeps the water clear and makes spring opening trivial.
Worked example
A 16,000-gallon vinyl pool in a freezing climate, liquid chlorine, a week before closing: chlorine 1, pH 7.7, alkalinity 90, calcium 220, stabilizer 45.
pH is just above the ideal range, so the plan starts with a small acid dose to bring it to 7.5. Then a closing shock to 11.5 ppm (a quarter of the 45 ppm stabilizer, rounded, which is above the 10 ppm floor) with liquid chlorine at dusk, at least 30 minutes after the acid. Calcium and stabilizer are fine. Over the next week chlorine drifts down into the 1–3 ppm range, which is the right time to add a winterizing product if you use one, lower the water and cover the pool.
How it's calculated
The chemistry uses the same planner as our pool chemical calculator, run with a closing shock at the routine level from our shock calculator. The winter saturation index uses our LSI method at 45 °F. The checklist follows standard winterizing practice; your equipment manuals come first where they differ.
Questions people ask
What chemicals do I need to close my pool?
Whatever your test says to balance it, plus chlorine for a closing shock. Many owners also add a winterizing product after chlorine drops to 1–3 ppm. Pool antifreeze is only for the lines in freezing climates.
When should I close my pool?
When the water stays below about 65 °F. Closing earlier in warm weather gives algae a chance to grow under the cover.
How much water do I drain when closing a pool?
In freezing climates, usually a few inches below the skimmer, or below the returns if you won't plug them. Follow your pool and cover maker's guidance, and don't take vinyl or fiberglass pools lower than they allow.
Should I shock before closing my pool?
Yes, about a week before, while the pump is still running. That gives the chlorine time to clear organics and drop back down before you add any winterizing product and cover the pool.
Estimates only. Product strengths vary from jug to jug and lose strength with age, so treat every amount here as a starting point. Follow the product label, add in stages, and retest before swimming. For stubborn algae, equipment faults or surface damage, call a pool professional. Full disclaimer.